Mile Stones

  • 2021

    Cox’s Bazar Wind Power Plant (66MW) in Bangladesh began construction.

  • 2020

    Total installed power capacity exceeded 10GW

  • 2019

    Energy output hit a record high;

    Profit doubled year on year;

         Listed among China’s top 10 electricity suppliers;

         Certificated as a national hi-tech enterprise.

  • 2018

    Renewable energy installed capacity exceed 1GW.

  • 2017

    Dam Monitoring Center, Renewable Energy Integrated Control Center began operation.

  • 2016

    First two solar power plants(40MW) began operation.

  • 2015

    Wuling has assisted SPIC in acquiring 19 hydro, and wind, power plants in Australia, Brazil, and Chile.

    First two wind power plants(100MW) in Hunan began operation.

  • 2014

    Tuokou Hydropower Plant, the last hydropower plant along the Yuanshui River basin, Tuokou Hydropower Plant was commissioned, indicating the end of the cascading development of Yuanshui River.

  • 2013

    First two wind power plants (99MW) began operation.

  • 2009

    CPID took over the 63% shares of Wuling’s from SPIC.

  • 2004

    Renamed as Wuling Power Corporation Ltd.

  • 2002

    Wuling was incorporated into SPIC Group.

  • 1995

    Authorized by the State Council for the cascading development of Yuanshui River, Hunan Wuling Hydropower Development Co., Ltd. was established.

  • 1994

    Wuqiangxi Hydropower Plant was commissioned.

  • 1987

    Hunan Wuqiangxi Hydropower Engineering Construction Company was established.